- Case Studies
Installation & Manufacture of Water Sampling Taps for South East Water
Installation & Manufacture of Water Sampling Taps for South East Water
Project Details
Maintained Properties
Years Collective Experience
Safety Compliance Checks
Project Overview
Project Overview
As part of South East Water’s ongoing innovation in water quality monitoring, Egan Brothers Facility Specialists were engaged to support the trial and rollout of new water sampling taps. These custom-designed taps allow for safe and easy collection of water samples directly from drinking water mains, helping to monitor system performance and improve public health outcomes.
In addition to conducting field installations, Egan Brothers also took over the manufacturing of the sample tap bollards, providing South East Water with a significant cost-saving while ensuring a consistent supply of high-quality, purpose-built units.
The project is currently ongoing, with a number of sample taps already installed across the South East Water region as part of a targeted trial.
Scope Of Work
Scope Of Work
-
Site Attendance & Assessment
Attended nominated locations to assess suitability for sample tap installation in consultation with South East Water engineers. -
Service Location
Identified and located all underground services to ensure safe excavation and installation practices. -
Water Line Alterations
Modified existing water infrastructure as required to accommodate the new sample tap connection point. -
Installation of Sampling Tap Bollard
Installed new tamper-proof sample tap units within custom bollards, designed to protect the tap and ensure safe, hygienic sampling. -
Site Reinstatement
Innovation in Manufacturing
Innovation in Manufacturing
Project Outcomes (to date)
-
Successful Installations Across the Region:
A growing number of water sampling taps have been successfully installed across key trial locations. -
Enhanced Water Quality Monitoring:
The taps provide safer and more accessible sample points for technicians, allowing consistent monitoring of drinking water quality from the source. -
Collaborative Innovation:
By combining installation expertise with in-house manufacturing capabilities, Egan Brothers has added value beyond field services.
Conclusion
Egan Brothers Facility Specialists are proud to support South East Water’s commitment to water quality and innovation through our role in the trial and deployment of water sampling taps. By taking responsibility for both installation and manufacturing, we have demonstrated our ability to deliver turnkey infrastructure solutions that are cost-effective, technically sound, and aligned with the needs of the Victorian water sector.
To read more about the trial, visit:
https://southeastwater.com.au/about-us/news/south-east-water-trials-new-water-sampling-taps